Our Services

Our Services

For free consultation contact one of our experts

Contact Us

Tesla Supercharger Installation by BuildWatt

Powered by Tesla. Built by BuildWatt.

We help property owners, fleets, and developers design, permit, install, and maintain Tesla Superchargers for cars and Megawatt Charging Systems (MCS) for heavy-duty trucks. From feasibility to operation, BuildWatt is your single partner for turnkey EV-charging deployment.

ROI & Cash Flow Analysis

Before you invest, we help you understand your site’s financial potential.

BuildWatt analyzes EV adoption, traffic patterns, charger utilization, and utility costs to model your expected revenue, ROI, IRR, NPV, and breakeven.

Highlights

  • Location-based revenue forecasts

  • Ownership vs revenue-share model comparisons

  • Data-backed cash-flow projections

  • Clear view of your potential passive income

Site Assessment

We evaluate your property’s power capacity, layout, accessibility, and market demand to determine its suitability for Tesla Superchargers.

Included

  • On-site walkthrough and infrastructure review

  • ADA and layout analysis

  • Demand forecast and revenue projection

  • Upgrade options if power is limited

Design & Engineering

Our in-house engineers produce permit-ready, stamped drawings that ensure safety, code compliance, and efficient charger operation.

Deliverables

  • Custom site layouts optimized for visibility and flow

  • Electrical and civil plans with load calculations

  • ADA-compliant, permit-ready packages

Permitting & Utility Coordination

We handle all paperwork, applications, and communication with Tesla, cities, and utilities—ensuring faster approvals and minimal revisions.

Scope

  • Power studies and upgrade coordination

  • Zoning, environmental, and building approvals

  • Full permit-submittal management until clearance

Construction & Installation

BuildWatt is Tesla-approved, EVITP-certified contractor to deliver safe, high-quality installations.

Process

  • Trenching, switchgear, and charger installation

  • Inspection, commissioning, and activation

  • Transparent pricing and schedule management

Maintenance & Support

Once your chargers go live, BuildWatt ensures 99.7 % uptime through proactive monitoring and Tesla coordination.

Service

  • Routine inspections and diagnostics

  • Remote monitoring and performance reports

  • Direct escalation to Tesla for any issues

FAQs- All You Need to Know

1. How much can I earn from Tesla Superchargers?

We provide site-specific revenue models factoring in EV demand, utility rates, and Tesla pricing.

2. What determines ROI?

EV traffic, utilization rates, installation cost, and your partnership structure.

3. How long until I break even?

Typically 3–6 years depending on site demand and energy pricing.

4. What’s included in a site assessment?

Power and layout review, ADA check, demand forecast, and revenue projection.

5. Do you perform physical site visits?

Yes — every assessment includes an on-site walkthrough by our engineering team.

6. Do you supply stamped, permit-ready plans?

Absolutely — our licensed engineers deliver PE-stamped electrical and civil drawings.

7. Is my site zoned for Tesla Superchargers?

Most commercial sites qualify by right; we confirm and handle approvals.

8. How long does permitting take?

Typically 4–8 weeks depending on jurisdiction and utility coordination.

9. Who installs the Superchargers?

BuildWatt manages certified, insured, and Tesla-approved installation crews.

10. How long does construction take?

Average 3–6 weeks once permits and power are ready.

11. What if a charger goes offline?

BuildWatt monitors all units and coordinates directly with Tesla for fast resolution.

12. How often are chargers serviced?

Tesla performs quarterly site checks; BuildWatt monitors continuously between visits.

13. Does BuildWatt offer long-term support?

Yes — we provide lifetime maintenance, reporting, and uptime management for every site.