FAQs
What does BuildWatt specialize in?
BuildWatt designs and develops high-power charging infrastructure for heavy-duty electric trucks. Our solutions integrate Tesla V4 and MCS (Megawatt Charging System) technology, providing reliable, future-ready charging for fleets and logistics operators.
How does BuildWatt support property owners and investors?
We offer flexible partnership models for landowners, investors, and fleet operators — from zero-cost hosting to full ownership. BuildWatt manages everything from design, permitting, and installation to long-term operation and maintenance.
What makes BuildWatt’s charging hubs unique?
Our charging stations are built for scalability and uptime. Each site is designed with smart grid integration, renewable energy options, and fleet-friendly layouts to support drayage, logistics, and long-haul truck operations.
How does BuildWatt integrate advanced technology?
By combining Tesla and BuildWatt power systems with intelligent energy management software, we ensure maximum efficiency, grid stability, and seamless compatibility with future MCS charging standards.
How can I partner with BuildWatt?
Whether you’re a property owner, fleet operator, or investor, BuildWatt offers structured programs that share revenue or equity. Contact our team to review your site, explore investment opportunities, and discover the best model for your goals.
How much can I earn from Tesla Superchargers?
We provide site-specific revenue models factoring in EV demand, utility rates, and Tesla pricing.
What determines ROI?
EV traffic, utilization rates, installation cost, and your partnership structure.
How long until I break even?
Typically 3–6 years depending on site demand and energy pricing.
What’s included in a site assessment?
Power and layout review, ADA check, demand forecast, and revenue projection.
Do you perform physical site visits?
Yes — every assessment includes an on-site walkthrough by our engineering team.
Do you supply stamped, permit-ready plans?
Absolutely — our licensed engineers deliver PE-stamped electrical and civil drawings.
Is my site zoned for Tesla Superchargers?
Most commercial sites qualify by right; we confirm and handle approvals.
How long does permitting take?
Typically 4–8 weeks depending on jurisdiction and utility coordination.
Who installs the Superchargers?
BuildWatt manages certified, insured, and Tesla-approved installation crews.
How long does construction take?
Average 3–6 weeks once permits and power are ready.
What if a charger goes offline?
BuildWatt monitors all units and coordinates directly with Tesla for fast resolution.
How often are chargers serviced?
Tesla performs quarterly site checks; BuildWatt monitors continuously between visits.
Does BuildWatt offer long-term support?
Yes — we provide lifetime maintenance, reporting, and uptime management for every site.